Metal Decking for Concrete: Types, Gauges, Spans, Installation and Cost

By Mohamed Skhiri · Updated November 2026 · 15 min read
Worker priming ribbed metal decking for concrete before the slab pour on a building floor

Photo: MTA Capital Construction, Wikimedia Commons, CC BY 2.0 (cropped, brightened)

Quick Answer

Metal decking for concrete is ribbed, galvanized steel sheet laid over steel beams or joists that serves as the form for a concrete floor or roof slab. Composite deck has embossed ribs that bond to the concrete, so the steel deck acts as the bottom reinforcement once the slab cures. Form deck is only a permanent form, and the slab needs its own rebar. Common rib depths are 1.5, 2 and 3 inches, gauges run from 22 (thinnest) to 16, and total slab thickness is usually 5 to 7.5 inches. Installed metal deck typically costs about $3 to $8 per square foot, before the concrete, reinforcement and studs.

Most steel-framed buildings, from offices and hospitals to parking garages, schools and mid-rise apartments, have floors made of concrete poured on metal decking. The steel deck goes down fast, needs no plywood forms to strip, gives workers a platform to stand on right away, and in composite systems becomes part of the structure. The photo above shows a crew priming steel deck before a pour on a large transit project in New York.

This guide explains what metal decking for concrete is, the difference between composite and form deck, rib depths, gauges and spans, how shear studs and reinforcement work, slab thickness, installation and fastening, pouring concrete on metal deck, fire ratings, costs and the mistakes that cause problems.

What Is Metal Decking for Concrete?

Metal decking for concrete is cold-formed steel sheet, roll-formed into a pattern of ribs (also called flutes) and valleys, usually galvanized for corrosion protection. Sheets are typically 24 to 36 inches wide and are cut to length to span across beams or joists. The metal deck is laid out, fastened to the structural steel, and concrete is poured on top. The ribs give the thin steel its stiffness, so it can carry the weight of wet concrete and the construction crew between supports.

Steel deck is often called floor deck, composite deck, form deck, B-deck, Q-deck (a trade term that started as a brand name), pan deck or simply decking. In the industry, deck products are designed and tested under the standards of the Steel Deck Institute (SDI), and the structural design follows SDI and American Iron and Steel Institute specifications together with the building code. Each deck manufacturer publishes load tables that show allowable spans, required gauges and slab capacities for its profiles.

Composite Deck vs Form Deck

Comparison of composite floor deck, form deck and roof deck as metal decking for concrete

As the diagram shows, there are two kinds of metal decking for concrete, plus roof deck, which is a separate product.

Composite floor deck has embossments, small raised or indented patterns pressed into the rib walls. When concrete hardens around them, the embossments lock the concrete and steel together so they act as one unit. The steel deck then works as the positive (bottom) reinforcement of the slab, and only light temperature and shrinkage reinforcement is needed in the concrete. Composite deck is the most common metal decking for concrete in steel buildings, usually with 1.5, 2 or 3 inch deep ribs.

Form deck, also called non-composite deck, is smooth and usually shallower, with corrugations around 9/16 inch to 1.5 inches deep. It serves only as a permanent form. The concrete slab is designed as a reinforced concrete slab on its own, with rebar or welded wire placed according to the structural design. Form deck is common on bar joist floors, mezzanines, bridge decks (stay-in-place forms), stair landings and smaller buildings.

Roof deck is designed to carry insulation and roofing, not a structural concrete slab. Its profiles (narrow, intermediate and wide rib) look similar, but it is not rated for the heavy wet weight of concrete. Never pour a concrete slab on roof deck unless a structural engineer has specified and checked it.

How Composite Metal Deck Works

Section through a composite floor with metal decking for concrete, shear studs, wire mesh and concrete topping

The section above shows a typical composite floor. Steel beams support the metal deck. Shear studs, short headed steel pins, are welded through the deck to the top flange of each beam. After the pour, the studs tie the slab to the beam, so the beam and slab act together as a composite beam, which is much stronger and stiffer than the bare steel beam alone. This lets engineers use lighter beams and longer spans.

The steel deck itself spans from beam to beam. During construction, before the concrete hardens, the bare deck must carry the wet concrete, its own weight and construction loads; this is often what limits the span. After the concrete cures, the deck and slab act together and carry the floor loads far more easily. Welded wire reinforcement or steel or synthetic fibers in the topping control shrinkage cracking and add strength over beams, and extra bars are sometimes added over supports where the slab is continuous.

Rib Depths, Profiles and Gauges

The main choices when specifying metal decking for concrete are rib depth, profile and gauge.

Rib depth. Composite decks are commonly made in 1.5 inch, 2 inch and 3 inch depths. Deeper ribs span farther: as a rough guide, 1.5 inch deck often spans 7 to 10 feet, 2 inch deck 8 to 12 feet, and 3 inch deck 10 to 15 feet without shoring, depending on gauge, slab thickness and concrete weight. Form decks are shallower and span shorter distances, often 3 to 7 feet over joists.

Profile. Some decks have open, trapezoidal ribs; others have re-entrant (dovetail) ribs that grip the concrete and give a flatter underside, useful for hanging ceilings and services. Cellular deck has a flat steel plate welded to the bottom, creating enclosed cells used to run electrical wiring and giving a clean ceiling underneath. Some decks come with a factory-painted underside where the ceiling will stay exposed. The photo below shows the trapezoidal shape of profiled steel sheet; floor deck profiles follow the same idea, with embossments added on composite deck.

Close view of trapezoidal steel sheet ribs, the same shape used in metal decking for concrete

Photo: Nordbleche, Wikimedia Commons, CC BY 3.0 (cropped)

Gauge. Steel decking is usually made in 22, 20, 18 and 16 gauge, where a lower number means thicker steel. A 22 gauge deck is about 0.0295 inch thick, 20 gauge about 0.0358 inch, 18 gauge about 0.0474 inch and 16 gauge about 0.0598 inch, based on design thickness. Heavier gauges span farther and carry more load, but cost more. Engineers choose the lightest gauge that meets the span, construction load and fire rating requirements.

Finish. Galvanized deck (often G60 or G90 zinc coating) is standard for floors and anywhere moisture is possible, such as parking structures and exterior slabs. Uncoated or primed deck is sometimes used in dry, enclosed areas. Painted deck is used where the underside stays visible, as in the photo at the top of this page, where the deck is being primed.

Slab Thickness on Metal Deck

Total slab thickness on metal decking for concrete is measured from the bottom of the deck to the top of the concrete. Common totals are 5 to 7.5 inches. A typical office floor might be 3 inch composite deck with 3.25 inches of lightweight concrete on top, for a total of 6.25 inches, or 2 inch deck with 3.5 inches of normal-weight concrete, for a total of 5.5 inches. The concrete thickness above the top of the ribs is usually at least 2 to 2.5 inches, and fire rating requirements often control this number.

Because concrete fills the ribs, the volume per square foot is less than a flat slab of the same total thickness. Deck manufacturers list the concrete volume in cubic yards per 100 square feet for each profile and slab depth, and estimators use those numbers instead of the total thickness. Remember also that the deck deflects under wet concrete, so extra concrete collects in the low areas; estimators often add 5 to 10 percent for this ponding. See concrete slab thickness and how to calculate yards of concrete.

Normal-Weight vs Lightweight Concrete on Deck

Concrete placed on metal decking for concrete may be normal-weight concrete, about 145 to 150 pounds per cubic foot, or structural lightweight concrete, about 110 to 115 pounds per cubic foot, made with expanded shale, clay or slate aggregate. Lightweight concrete reduces the dead load on the deck, beams, columns and foundations, and it gives better fire resistance at a given thickness, so a thinner slab can achieve the same fire rating. It costs more per cubic yard and is somewhat harder to finish, and it needs careful moisture control if floor coverings will be glued down. Normal-weight concrete is cheaper and easier to place and finish, but the slab may need to be thicker for the same fire rating. See lightweight concrete.

Shoring Metal Deck

If the span between beams or joists is longer than the deck's unshored span limit for the planned slab, temporary shoring is needed under the deck during the pour and until the concrete gains strength. Shoring adds cost and slows the work, so designers usually pick a deck depth and gauge that avoids it. When shoring is used, posts and beams are set at mid-span or at the spacing the engineer specifies and left in place until the concrete reaches the required strength, often 75 percent of design strength. Removing shores too early can cause excessive deflection or cracking. Always follow the deck manufacturer's construction span tables and the structural drawings.

Installing Metal Decking for Concrete

Metal decking for concrete is installed by ironworkers or deck erectors after the steel frame is plumbed and bolted. The process typically follows these steps:

1. Delivery and landing. Bundles of metal deck are lifted by crane and landed on the steel frame near beams, never in the middle of a span, so the bundles do not overload the steel. Bundles are opened only when the crew is ready to install, because loose sheets can blow off in the wind.

2. Layout and spreading. Sheets are laid out with ribs perpendicular to the supporting beams, starting from a reference line. Each sheet overlaps or interlocks with the next along the side laps, and ends either butt or overlap over supports, as the drawings require. Sheets must bear at least the minimum length on each support, often 1.5 inches or more.

3. Fastening to supports. The steel deck is attached to the beams with puddle welds (arc spot welds), powder-actuated pins or self-drilling screws, at the pattern shown on the drawings, for example a 36/4 or 36/7 pattern meaning a fixed number of fasteners across each 36 inch sheet. Side laps between sheets are fastened with button punches, screws or welds at a set spacing. This fastening makes the metal deck act as a diaphragm that carries wind and earthquake forces to the frame, so it is a structural requirement, not just a way to keep sheets in place.

4. Closures and edge forms. Pour stops (light gauge steel edge forms) are installed at slab edges and openings to hold the concrete at the right height. Closures fill the rib ends at walls, columns and edges so concrete does not run out. Cell closures and column closures are cut and fastened as needed.

5. Shear studs. On composite floors, a stud welding crew welds headed studs through the deck to the beams using a stud gun, at the spacing on the drawings. Each stud is tested by bending or ringing a sample to confirm a good weld.

6. Reinforcement and embeds. Welded wire reinforcement, rebar over beams, slab edge bars, sleeves, electrical floor boxes and embedded plates are placed. Wire mesh should be supported on chairs at the right height, not left lying on the deck.

7. Inspection. Special inspectors check deck fastening, side laps, stud welds and reinforcement before the pour, as the building code requires on most commercial projects.

Pouring Concrete on Metal Deck

Concrete is placed on metal decking for concrete with a pump or by crane and bucket. A few points matter more than on ground-supported slabs:

Avoid heaping concrete. Dumping large piles of concrete in one spot can overload the deck and cause it to deflect or even fail locally. Spread concrete evenly and do not pile it higher than the slab thickness, especially at mid-span.

Control the thickness. The deck and beams deflect under the wet load. Finishing to a flat, level surface means more concrete at mid-span; finishing to a constant thickness means the floor follows the deflection. Engineers decide which approach to use and may camber beams to offset deflection. Laser screeds and frequent depth checks help.

Protect the deck. Workers walk on the metal deck and on the wire mesh, so planks are used for wheelbarrows and pump hose. Holes in the steel deck must be covered or framed to prevent concrete leakage and falls.

Finishing and curing. Concrete on steel deck can only lose moisture from the top, so it bleeds and sets differently from a slab on ground. Finishing is timed accordingly, and proper curing is important to reduce cracking. Steel-troweled finishes, broom finishes for parking decks, and topping for future floor coverings are all common. See concrete pump truck cost and how long concrete takes to cure.

Reinforcement and Crack Control

Slabs on metal decking for concrete crack mainly from drying shrinkage and from negative bending over the beams, where the slab is continuous. Common crack-control measures include welded wire reinforcement such as 6x6 W1.4xW1.4 or heavier, placed about 1 inch below the top of the slab; macro synthetic or steel fibers, which some deck manufacturers and code reports allow to replace welded wire for temperature and shrinkage reinforcement; additional rebar over girders and around columns; and good curing practice. Cracks over beams are common and usually not structural, but they should be minimized where floors will be exposed, polished or covered with brittle tile. See wire mesh for concrete, fiber-reinforced concrete and rebar in concrete.

Fire Ratings

Building codes require many floors to have a fire-resistance rating, typically 1 to 3 hours. Floor assemblies with metal decking for concrete earn ratings through tested assemblies, such as UL listings, that specify the deck type, concrete type and thickness, and whether the beams and deck need spray-applied fireproofing. A common way to achieve a 2 hour rating without fireproofing the deck is to use a thick enough concrete topping above the ribs, for example about 3.25 inches of lightweight or about 4.5 inches of normal-weight concrete, though exact values come from the listed assembly. Beams usually still need spray fireproofing or intumescent coating. The fire rating often controls slab thickness more than structural strength does.

Metal Decking for Concrete in Residential and Small Projects

Metal decking for concrete is not just for high-rise buildings. It is used for concrete floors over basements and garages, where a steel-framed concrete floor lets a garage sit above a usable room; for elevated patios and decks over living space, where it supports a waterproofed concrete topping; for mezzanines in warehouses and shops; for stair landings and pans; and for small commercial buildings with bar joist framing. In houses, a concrete floor on steel deck over a basement or storage room is a common way to build a heavy, fire-resistant garage floor, but it must be designed by an engineer, with proper beams, deck, reinforcement and drainage. DIY use of metal decking for concrete is limited; most people hire a contractor and engineer. See concrete deck and concrete beams.

Metal Decking for Concrete vs Other Floor Systems

Metal decking for concrete competes with several other ways to build an elevated concrete floor. Cast-in-place concrete on plywood forms needs formwork, shoring and stripping on every floor, which takes more labor and time, but it gives full design freedom and no exposed steel deck underneath. Precast hollow-core planks are fast and span far, but they need cranes, toppings and careful connections, and they are less flexible for openings. Post-tensioned slabs allow thin, long-span floors without beams, but they need specialized crews and careful drilling later. Metal deck floors are usually the fastest choice in a steel-framed building because the steel deck goes down right behind the steel erection, gives every trade a working platform, and needs no form stripping. The trade-off is that the metal deck underside usually needs fireproofing or a tested rating, and the steel deck must be protected from corrosion in wet or salty environments.

Choosing metal decking for concrete also affects the rest of the building. A composite steel deck floor is lighter than a thick flat slab, which reduces column and foundation sizes. The ribs of the metal deck create space for running small conduits and, in cellular steel decking, for floor power and data. Hangers for ceilings, ducts and pipes attach to the metal deck with special hanger tabs or to the concrete with inserts placed before the pour. Planning these items early avoids drilling into the finished slab, where hidden welded wire, the steel deck ribs and embedded conduits make coring slower. See post-tensioned concrete slab and precast concrete.

Drilling and Anchoring into Concrete on Metal Deck

Anchoring into a slab on metal decking for concrete takes more care than anchoring into a solid slab. From below, anchors are set into the concrete through the bottom of the steel deck flutes, using anchors specifically tested for installation through metal deck, because the concrete in the flute is thin and close to the edge. From above, drilling too deep can punch through the metal deck and damage it, and drilling into the high rib areas hits thinner concrete. Before cutting new openings in an existing floor with metal decking for concrete, scan the slab for reinforcement, conduits and post-tensioning tendons, and have an engineer check the opening, since cutting ribs or studs can weaken the floor. See types of concrete anchors and concrete core drilling.

Metal Deck Cost

Costs vary by region, project size, gauge, depth and finish, but typical 2026 ranges for metal decking for concrete are:

Deck material: about $1.50 to $4 per square foot for 20 to 18 gauge composite or form deck, more for 16 gauge, cellular or painted deck.

Installed deck: about $3 to $8 per square foot including fastening, side laps, closures and edge forms, on commercial jobs.

Shear studs: often $2 to $5 per stud installed, with many studs per beam.

Concrete and reinforcement: concrete placement, pumping, welded wire and finishing commonly add $6 to $12 or more per square foot, depending on slab thickness and finish.

Total floor system: deck, studs, reinforcement and concrete often total about $10 to $20 per square foot, not counting the steel beams, fireproofing and shoring if required. Small residential projects cost more per square foot because of mobilization and engineering. See concrete slab cost and concrete price per yard.

Common Mistakes with Metal Deck

Using roof deck for a slab. Roof deck is not designed for concrete and can collapse under the wet load.

Spans too long without shoring. Exceeding the construction span causes excessive deflection, ponding and in worst cases deck failure during the pour.

Missing fasteners or side laps. Skipping welds or screws weakens the diaphragm and lets sheets shift or separate under wet concrete.

Heaping concrete. Dumping concrete in piles overloads the deck locally.

Mesh left on the deck. Welded wire lying at the bottom does little for crack control; it must be chaired up.

Poor drainage and corrosion. Water trapped in the ribs before the pour, deicing salts in parking structures, or uncoated deck in humid areas leads to rust. Use galvanized deck and remove water and debris before pouring.

Underestimating concrete. Deflection and ponding mean more concrete than the plan thickness suggests; running short in the middle of a pour creates a cold joint. See cold joints in concrete.

Frequently Asked Questions

What is metal decking for concrete called?

It is called steel deck, floor deck, composite deck, form deck, B-deck or Q-deck, depending on type and region.

What gauge metal deck is used for concrete?

Usually 22, 20, 18 or 16 gauge, with 20 and 18 gauge most common on floors. The engineer selects gauge from span and load tables.

How thick is concrete on metal deck?

Total slab thickness is usually 5 to 7.5 inches, with 2 to 4.5 inches of concrete above the ribs, depending on fire rating and loads.

Does concrete on metal deck need rebar?

Composite deck acts as the main bottom reinforcement, so it usually needs only welded wire or fibers, plus bars over beams if specified. Form deck slabs need full rebar design.

How far can metal deck span?

Roughly 7 to 15 feet for composite deck without shoring, depending on depth, gauge and slab weight. Check the manufacturer's tables.